NEW DAWN PROJECT
David Lambert, Northhampton
This installation was a no-brainer for our client, who was preparing to install a heat pump and wanted a renewable energy solution to complement it. With a perfectly positioned, south-facing roof and an incredibly cost-effective setup, this project was as straightforward as they come. However, the real magic happened post-installation—the system has far exceeded expectations, generating more energy than projected. With both solar and a heat pump working together, this home is now set up for long-term energy savings and sustainability.
Timeline
Full installation completed in one day, with scaffolding up for two days.
Location
Southminster
Savings
£47k over lifetime of the system
Project Stats
4.35
kWp System
10 x Jinko Tiger 435w
installed
9.5kWh GivEnergy
6 Years
Southminster